Skip to main content

HPP Pečnik

  • Start of operation: 1983
  • Watercourse: Peklenska grapa
  • Average flow: 0.40 m3/s
  • Total rated flow: 0.40 m3/s
  • Rated output: 0.095 MW
  • Annual production: 360 MWh