Skip to main content

HPP Gradišče

  • Start of operation: 1922
  • Watercourse: Vipava
  • Average flow: 15.11 m3/s
  • Total rated flow: 12 m3/s
  • Rated output: 0.15 MW
  • Annual production: 550 MWh